INSTALLATION REQUIREMENTS

Fuss-free, quick and cost-effective installation

Our SmartPools™ Arena can be installed within 1 working day. This excludes time for site preparation which would require an average of 5 working days.

The pool structure is built away from the site doing away with the inconveniences otherwise incurred as a result of on-site construction works.

Installation Procedure

Installation Procedure

Site Requirements

  • Leveled, concrete floor capable of supporting 200 lbs./sq.ft (900 kg/ sq m)
  • Minimum land area of 130 sq.ft or 12 sq m
  • Electricity supply for 3 Phase 400 VAC
  • Water facility able to fill the pool and top up
  • Drainage at the site to be provided